NKSTONE® Request a quote

Application

A floor is a different specification from a wall.

Point loads, trolley wheels, grit and water. A 20 mm wall panel is not a floor panel, and the finish that looks best on a wall is often the wrong one underfoot.

Thickness
25 / 30 mm
Face
Filled
Format
3200 × 1600 mm
Finish
Honed, matte

Travertine look flooring uses 25 or 30 mm panels with a filled face, laid on a prepared screed with a joint layout set to the room. The filled face closes the pores so grit and spills do not lodge; open pore is for walls, not floors.

Why 25 or 30 mm

Floor panels take point loads that wall panels never see: a chair leg, a pallet truck, a dropped tool. Thickness buys bending capacity and edge strength at the joint, which is where a floor panel fails first. A 20 mm panel is a wall or facade product.

AreaThicknessNote
Residential floor25 mmBonded to a sound screed
Lobby, retail30 mmHigher point loads, more edge exposure
Wall, bonded20 mmNot a floor specification
Facade20 mmBracket-fixed, ventilated

The finish decides the maintenance

A honed filled surface is the practical floor finish: matte enough to hide footprints, closed enough to wipe. An open-pore floor collects grit in the pits and is effectively a dirt trap. Avoid a high polish anywhere water can stand.

Joint layout on a floor

On a 3200 × 1600 panel the joints can be set to the room rather than to a tile module: a joint on the door line, a joint under a change of level, and no narrow offcut at a wall. Movement joints follow the structure, not the panel grid.

Questions buyers ask

What thickness for travertine look flooring?
25 mm for residential work, 30 mm for lobbies and retail where point loads are higher. 20 mm is a wall and facade specification.
Is it slippery?
A honed matte surface has good grip. Slip resistance depends on the finish and on contamination, not on the stone name; a polished surface of any material is a risk when wet.
Can it go over underfloor heating?
Yes, provided the assembly and adhesive are specified for it and the heating is commissioned gradually. The panel has low thermal movement but the screed does not.

Send the drawing. We will return a joint layout.

Panel layout, area, substrate and required delivery date are enough to start. Quotation within 24 hours.